Agenda and draft minutes

Audit, Governance and Standards Committee - Thursday 15th October 2026 6.00 pm

Venue: Council Chamber, Arun Civic Centre, Maltravers Road, Littlehampton, BN17 5LF. View directions

Contact: Helen Burt 

Media

Items
No. Item

286.

Appointment of Vice-Chair for the Meeting

Minutes:

The Vice-Chair in the Chair proposed that Councillor Wallsgrove should act as Vice-Chair for the meeting, which was seconded by Councillor Bicknell. Following a vote, this was declared CARRIED, and it was confirmed that Councillor Wallsgrove would act as Vice-Chair for the meeting.

 

 

287.

Apologies

Minutes:

Apologies for absence had been received from Councillors Stanley, Purser, Goodheart and Independent Person Mr John Cooke.

 

288.

Declarations of Interest

            Members and Officers are reminded to make any declarations of pecuniary, personal and/or prejudicial interests that they may have in relation to items on this agenda and are reminded that they should re-declare their interest before consideration of the item or as soon as the interest becomes apparent.

 

            Members and officer should make their declaration by stating :

a) the application they have the interest in

b) whether it is a pecuniary, personal and/or prejudicial

c) the nature of the interest

d) if it is a prejudicial or pecuniary interest, whether they will be exercising their right to speak to the application

 

Minutes:

No Declarations of Interest were made during this Item.

 

289.

Minutes pdf icon PDF 99 KB

The Committee will be asked to approve as a correct record the Minutes of the Audit & Governance Committee held on 13 July 2026.

Minutes:

The Minutes of the meeting held on 13 July 2026 were approved by the Committee. These would be signed after the meeting.

 

290.

Items on the agenda that the Chairman of the meeting is of the opinion should be considered as a matter of urgency by reason of special circumstance

Minutes:

          There were no urgent items.

 

291.

Public Question Time

To receive questions from the public (for a period of up to 15 minutes)

Minutes:

No public questions had been submitted.

 

292.

Questions from Members

To consider general questions from Members in accordance with Council Procedure Rule 14.3 (General Questions).

Minutes:

No questions from Members had been submitted.

 

293.

Monitoring Officer Quarterly Report pdf icon PDF 199 KB

This is a quarterly report to give the committee an overview of the work of the Monitoring Officer that falls within the scope of the functions for which the committee is responsible.

 

The council’s constitution (Part 3, Section 5.1) outlines the functions for which the Audit, Governance & Standards Committee is responsible, including the reviewing of any Code of Conduct complaints.  This report advises the committee of those complaints received since the last report, and the progress made by the Monitoring Officer in respect of complaints previously reported to the committee.

[15 Minutes]

 

Additional documents:

Minutes:

          Upon the invitation of the Chair, the Monitoring Officer presented the quarterly Monitoring Officer Report which updated the Committee on governance matters, Member training, standards issues and legislative changes.

 

          Members were advised that the review of the Member/Officer Protocol, deferred from the July meeting, would be presented to the Committee at the meeting on 03 December 2026.

 

          The Committee was informed that significant progress had been made in addressing historic Code of Conduct complaints. Whilst the report reflected the position as at July 2026, nine of the sixteen long-standing cases had since been resolved and closed. It was anticipated that all remaining historic complaints would be determined before the next meeting. A revised process had been implemented to ensure that future complaints were dealt with promptly and in accordance with the approved procedure. In addition to addressing existing complaints, work had been undertaken to identify the underlying causes of complaints and opportunities to reduce their occurrence. As part of this work, engagement with town and parish clerks would be reinstated to provide support and guidance aimed at preventing issues from escalating into formal complaints.

 

          The Committee received an update on Member training arrangements. Requests had been received for additional training and the potential introduction of mandatory training for participation on certain committees. Members would be contacted to identify any further training requirements, enabling appropriate arrangements to be made within the limited timeframe prior to the May 2027 local elections. Work was also underway to develop the Member induction programme for Councillors elected in May 2027.

 

          The report highlighted recent guidance issued by the Local Government Association in relation to the Debate Not Hate campaign and the promotion of healthy and respectful debate. Members were encouraged to familiarise themselves with the guidance.

 

          The Committee was also updated on the implementation of the requirements arising from the English Devolution and Community Empowerment Act relating to the publication of Members' addresses.

 

The recommendations were proposed by Councillor Wallsgrove and seconded by Councillor Turner.

 

Members welcomed the Monitoring Officer to her first meeting of the Committee and thanked her for the report. A Member requested an update on which of the complaints listed in the report had since been resolved. He also suggested that information on the Nolan Principles be circulated to all Members, noting that references to those principles appeared regularly in Code of Conduct complaints and that newer Members may benefit from a reminder of their importance. The Monitoring Officer advised that several historic complaints had now been closed, including 2024/13, 2024/14, 2024/15, 2024/16, 2024/ 17, 2025/05, 2025/06, 2025/07 and 2025/14. More recent complaints were also being progressed promptly in accordance with the adopted procedure, ensuring that no new backlog was developing. A number of remaining cases had either been referred to the Independent Persons for their views or required further work before a determination could be reached. All outstanding historic complaints were expected to be resolved before the Committee next meeting, with hearing dates already identified should any formal hearings prove  ...  view the full minutes text for item 293.

294.

Review of the Scrutiny Arrangements in Service Committees at Arun District Council pdf icon PDF 170 KB

This report presents the findings of the independent review undertaken by the Centre for Governance and Scrutiny (CfGS) at the request of the Constitution Working Party. It seeks Members’ views on the areas requiring future governance improvement and asks Members to consider the Council’s response in light of ongoing uncertainty regarding future governance arrangements and Local Government Reorganisation (LGR).

 

Representatives from CfGS will be present at the meeting to provide a short presentation outlining the key findings of their report and to respond to Member questions.

[20 Minutes]

Additional documents:

Minutes:

         Upon the invitation of the Chair, the Committee Services Manager introduced the report which presented the findings of an independent review of scrutiny arrangements within the Council's committee system, undertaken by the Centre for Governance and Scrutiny. The review had been commissioned by the Constitution Working Party to provide an independent assessment of how scrutiny, challenge and assurance currently operated within the Council's governance arrangements and to identify opportunities for improvement.

 

The review concluded that effective scrutiny and challenge were taking place within the existing committee system and did not recommend any fundamental redesign of the Council's governance arrangements. However, it identified a number of areas where governance, decision-making, Member leadership, committee work programming, report quality and assurance arrangements could potentially be strengthened. The Committee was informed that the context in which the recommendations were being considered had changed significantly since completion of the review. The Council was preparing for elections in May 2027 and had received confirmation that its governance arrangements would revert from the current committee system to a Leader and Cabinet model by June 2027. In light of these developments, the report did not seek approval of a detailed implementation programme. Instead, Members were invited to consider the findings of the review, identify the areas they believed should remain priorities for governance improvement and consider which recommendations would continue to be beneficial and proportionate as the Council transitioned to the new governance arrangements.

 

A draft Governance Improvement Framework was included at Appendix B to support the Committee's consideration of the review's findings and to ensure that the learning and recommendations arising from the review were retained for future consideration.

 

The Committee was advised that a representative of the Centre for Governance and Scrutiny who had been due to attend the meeting, was unfortunately unable to attend, and had provided apologies.

 

The recommendations were proposed by Councillor Wallsgrove and seconded by Councillor Walsh.

 

The Chair invited debate and one member thanked the officers for the comprehensive and well-prepared report, but questioned whether recommendations relating to improving the committee system remained relevant, given the requirement to move to a cabinet model. It was suggested that these recommendations may no longer be a priority and that focus should instead be placed on proposals that would remain relevant regardless of governance arrangements.

         

Members sought clarification on whether the proposed work programme was intended to provide a transition plan from the current committee system to a cabinet model, suggesting that the recommendations were less about improving the existing system and more about creating the conditions necessary for establishing future governance arrangements. Officers advised that the work programme had been developed at pace because decisions on future governance arrangements would likely need to be made before the pre-election period. It was explained that many of the review findings were not specific to the committee system and related instead to broader themes such as report quality, work programming, efficiency, member development, assurance, strategic oversight and effective decision-making. The purpose of the review was therefore  ...  view the full minutes text for item 294.

295.

2025/26 External Audit Update

A verbal update will be provided to the Audit, Governance and Standards Committee by representatives from Ernst & Young LLP relating to the latest progress for the 2025/26 External Audit.

[5 Minutes]

Minutes:

           Upon the invitation of the Chair, the External Auditor gave a verbal update on the progress with the 2025/26 external audit. It was reported that planning and interim audit work had been completed and that the audit remained on track. The Council had published its Statement of Accounts within the statutory deadline and the public inspection period had been completed. Detailed working paper requests had been issued to support the audit process and that all requests had been responded to promptly, placing the audit team in a strong position ahead of the main phase of audit fieldwork.

 

          Members were informed that audit execution work would commence at the end of the month, with a team of up to five auditors assigned to the engagement. The audit team would be on site for two days each week, as this was considered the most effective way to facilitate direct engagement with officers and resolve any issues efficiently. The intention was for all audit work to be completed by the end of the calendar year. A Special meeting of the Committee had been arranged for 20 January 2027 to receive the Audit Results Report and consider the outcome of the audit. This timetable would enable the Council to meet the statutory backstop date for issuing the audit opinion by the end of January. Members were also informed that the Auditor’s Annual Report, containing findings from the audit work, would be provided in draft electronically by the end of November before being brought to the January meeting for formal consideration.

 

          In concluding the update, it was noted that the Council's position had improved significantly compared with two years earlier, when Members had been advised that an audit could not be completed and the statement of accounts had been published late. While acknowledging that further work remained to rebuild assurance, it was observed that substantial progress had been made and that the authority was now in a much stronger position.

 

          There were no questions from Members.

 

          The Committee noted the update.

 

296.

Local Government Audit – From Reset to Recovery (2024/25 Insights) pdf icon PDF 3 MB

Ernst & Young LLP (EY) will present the ‘From Reset to Recovery Confidence in Local Government Audit’ report, the EY perspective on local government audits across England for 2024/25 including the impact of the statutory audit reset process and observations about the drivers of successful recovery; and the ‘Arun District Council From Reset to Recovery’ report, the EY perspective on where Arun sits within the road to recovery.

[10 Minutes]

Additional documents:

Minutes:

          Upon the invitation of the Chair, the External Auditor presented the report, which comprised two parts. The first set out the national position regarding the local government audit backlog and the actions taken across the sector to address it, while the second provided council-specific analysis comparing the authority's position with that of other local government bodies.

 

          It was explained that the report drew on audit work undertaken during the reset period and reflected experiences across councils at different stages of recovery. The report sought to identify factors that distinguished authorities that had successfully rebuilt assurance from those where progress had proved more challenging. Its purpose was to share evidence, examples of good practice and insights to support improvement across the local government sector.

 

          Attention was drawn to the council-specific analysis within the report. Members were advised that, based on the auditors’ assessment of readiness to support the audit process, the Council's performance during the previous year compared favourably with many other authorities. It was noted that the Council had been assessed within the second quartile for its arrangements to support audit activity.

 

          The External Auditor also highlighted the report's assessment of assurance levels. It was explained that the Council remained within the third quartile, reflecting the disclaimer opinion issued on the 2022/23 accounts. However, significant progress had been made over the course of the year, demonstrating a positive trajectory. This progress was attributed to a stable finance team, the timely preparation of the Statement of Accounts and improved arrangements to support the audit process. Members were advised that, while further work remained to fully rebuild assurance, the overall direction of travel was positive and the Council's position had improved considerably.

 

          Members welcomed the report and commended the Section 151 Officer on progress made in improving the Council's audit position. Questions were raised about whether achieving a second-quartile ranking for audit readiness was sufficient and whether additional resources could help the authority improve further. In response, the External Auditor advised that the Council had made significant progress from its previous position and was on a positive trajectory, although there was no room for complacency. The priority remained the successful completion of all planned audit procedures and the continued rebuilding of assurance.

 

          Officers explained that the improvements had been supported by additional specialist accounting resources brought in to assist the finance team. While this had incurred costs, it was considered a worthwhile investment to maintain progress and ensure the Council continued to meet its statutory obligations. Members were advised that failure to produce audited accounts could have serious consequences, including increased external scrutiny and reduced confidence from lenders and other organisations.

 

          During the discussion, Members expressed appreciation for the work undertaken by finance officers and auditors. A concern was also raised regarding the report's formatting and the amount of printing required. Members noted the value of the wider sector context provided in the report and its explanation of the challenges facing local government audits nationally.

 

          In response to a question about how  ...  view the full minutes text for item 296.

297.

Ernst & Young Reserve Risk Assessment Update Report pdf icon PDF 249 KB

Ernst & Young LLP will present the ‘Rebuilding audit assurance: the path to an unqualified opinion’ report, an addendum to the Audit Plan which sets out their risk assessment procedures performed in respect of opening reserve balances.

[15 Minutes]

Minutes:

          Upon the invitation of the Chair, the External Auditor presented the report, which was an addendum to the Audit Plan, setting out the approach to rebuilding assurance in relation to the Council's reserves. Members were advised that the report identified the areas where assurance needed to be rebuilt, the level of risk associated with each area and the work proposed to address them. It was explained that the focus of the current year's audit would be on completing all planned audit procedures, rather than undertaking specific work to rebuild assurance over reserves. Members were informed that all planned procedures had been completed in the previous year with the exception of work relating to debtors, creditors and a small element of work concerning IFRS 16 leasing arrangements. Successfully completing all planned procedures during the current audit year would place the council in a strong position to begin rebuilding assurance over reserves in the following year.

 

          No questions were raised by members.

 

          The Committee noted the report.

 

298.

Internal Audit Progress Report September 2026 pdf icon PDF 149 KB

The report outlines the progress of the Council’s Internal Audit service against the approved Internal Audit Plan for 2026/27 from 1 April 2026.

[15 Minutes]

Additional documents:

Minutes:

The Chair welcomed the new Chief Internal Auditor and Audit Manager from the Southern Internal Audit Partnership, who then introduced themselves to the Committee. They presented the Internal Audit Progress Report for September 2026.

 

Members were advised that Internal Audit remained appropriately resourced, fully independent and had not experienced any restrictions in carrying out its work. The report provided an update on delivery of the 2026/27 Internal Audit Plan, progress against agreed management actions and the outcomes of audit work completed since the previous meeting. Although no 2026/27 audit reviews had been finalised at the time the report was prepared, all reviews expected to be underway were in progress. Changes had been made to the audit plan to reflect emerging risks and management concerns, and approval of those changes was sought.

 

It was reported that one review from the 2025/26 Audit Plan, relating to contract management, had been completed and had received a Limited Assurance opinion. While a number of positive governance arrangements had been identified, weaknesses were found in areas including the contract register, contract monitoring and the recording of contract performance. Management had agreed 11 high-priority actions to address the issues identified.

 

The Committee was advised that there were currently 13 overdue high-priority audit actions, details of which were included within the report. Members also noted the introduction of a new ‘retired’ category for audit actions which were no longer considered appropriate due to changed circumstances, where management had formally accepted the associated risk.

 

A further update was provided that, since publication of the report, two final audit reports and three draft reports had been issued, and work on Quarter 3 audits was progressing as planned. Internal Audit remained on track to deliver the approved Audit Plan.

 

          The recommendations were proposed by Councillor Bicknell and seconded by Councillor Wallsgrove.

 

          The Chair invited questions and debate. Members sought clarification regarding business rates debt reported within the audit action tracking. The Committee was advised that the debt related to business rates arrears, the majority of which represented amounts owed across the collection cycle for the current financial year and were shared with other precepting authorities. It was further noted that the Council's share of collected business rates was approximately 40% and that work was ongoing, including through an external provider, to recover historic arrears.

 

          The Committee also queried findings from the contract management audit, including non-compliance with quotation requirements in a sample of repairs examined, and no response being provided by the service to an update requested by SIAP. Members were advised that corrective actions were being implemented, particularly within Housing Services, including strengthening procurement processes, contract management arrangements and legal documentation. It was requested that a future update be provided by the Group Head of Housing, to enable the Committee to monitor progress against the agreed management actions and obtain assurance that value for money was being achieved.

 

Councillor Turner proposed that the meeting be moved into exempt business in order to ask questions around the exempt appendix (appendix  ...  view the full minutes text for item 298.

299.

Treasury Management – Quarter 1 Report 2026/27 pdf icon PDF 537 KB

Minutes:

          Upon the invitation of the Chair, the Group Head of Financial Services presented the report, which provided an update on the Quarter 1 Treasury Management for the period ending 30 June 2026. Members were advised that the Council had continued to manage its cash investments and borrowing arrangements prudently and in accordance with the approved Treasury Management Strategy and the CIPFA Code of Practice.

 

The Committee was informed that the Council had complied with all relevant legislative and regulatory requirements during the quarter and that no treasury management limits had been breached. As at 30 June 2026, the Council held an investment portfolio of approximately £46.2 million, with the full list of investments set out in Appendix 1 of the report. It was reported that cash balances continued to be invested in accordance with the core priorities of security, liquidity and yield. The Committee was advised that the Council had generated investment income of approximately £416,000 during Quarter 1, achieving an average return of 4.16%. Members noted that this exceeded both the benchmark rate of 3.73% and the budgeted return of 4.01%. It was further reported that the Council's only borrowing continued to be the historic Housing Revenue Account (HRA) self-financing debt, which stood at approximately £35 million.

 

 

          The recommendations were proposed by Councillor Huntley and seconded by Councillor Wallsgrove.

 

          There were no questions from Members.

 

          The Committee

 

                    RECOMMEND TO FULL COUNCIL to

 

1.     note the Quarter 1 treasury management report for 2026/27;

 

2.     note the treasury activity for the quarter ended 30 June 2026, which has generated interest receipts of £416,438 (4.16%) against a budget of £2,021,310 (4.01%); and 2

 

3.     note the quarter 1 prudential and treasury indicators for 2026/27 contained in the report.

 

300.

Corporate Risk Register pdf icon PDF 149 KB

The Corporate Risk Register is reviewed and updated in line with the requirements of the council’s Risk Management Framework.

 

Quarterly updates reflecting revisions are reported to the Audit Governance and Standards Committee, this report highlights the changes since the last update.

 

This report details any updates resulting from the review.

[15 Minutes]

Additional documents:

Minutes:

          Upon the invitation of the Chair, the Insurance, Risk and Procurement Manager presented the report, which updated the Committee on the latest review of the Corporate Risk Register. Members were advised that the review focused on the Council's high risks, which had been considered by the Corporate Leadership Team in September 2026 and were subject to quarterly review in accordance with the Council's Risk Management Framework. Four housing-related risk entries remained under review. Risk owners had been identified and a comprehensive review was underway, with revised risk entries due to be reported to the Committee in December 2026. Members were also advised that the relevant risk owners would attend that meeting.

 

          It was reported that the risk relating to devolution and Local Government Reorganisation had been reviewed following the Government's announcement regarding a review of the wider Local Government Reorganisation programme. Members were referred to the updated risk entry within the agenda papers. All other changes arising from the review had been incorporated into the individual risk entries contained within the report.

 

          The Chair invited debate and Members sought an update on the risk relating to the Alexandra Theatre project, particularly in light of a request for an extension of time which had reportedly been refused. The Committee was advised that there were no further updates available at that stage beyond ongoing legal engagement where required. The Committee also sought clarification regarding project management arrangements for the Alexandra Theatre project, particularly whether the project manager would remain in place to oversee any snagging and rectification works following completion. Members were advised that this would be dependent on the outcome of discussions regarding the extension of time request. However, it was noted that, in normal circumstances, a project manager involved throughout a project would typically remain involved for at least part of the snagging period.

 

          In relation to the risk concerning the Bognor Regis Arcade project, Members queried the reasons for delays to the scheme. The Committee was advised that a number of changes had occurred since the project was originally approved and that a more detailed update was expected to be presented to the Economy Committee later in the year. It was noted that further information would be available through that report.

 

          The Committee noted the report.

 

301.

Counter Fraud Update pdf icon PDF 180 KB

The Audit, Governance and Standards Committee is the designated body for oversight of the council’s anti-fraud culture. As part of its agreed workplan, an annual report on counter fraud activity is presented to update the Committee.

[10 Minutes]

Additional documents:

Minutes:

          Upon the invitation of the Chair, the Group Head of Financial Services presented the report. Members were advised that the Council maintained an established framework for preventing, detecting and investigating fraud, supported by appropriate policies, governance arrangements and independent assurance through Internal Audit and Committee oversight. Counter fraud activity during 2025/26 had resulted in 15 Council properties being recovered through tenancy fraud investigations and a number of housing applications being refused where fraud risks had been identified, generating an estimated notional benefit of £4.185 million. In addition, 70 council tax accounts claiming Single Person Discount had been identified as requiring corrective action, resulting in an estimated annual increase in council tax liability of £43,000. Members also noted that the Empty Homes Officer had helped bring 101 properties back into occupation during the year.

 

          The Council’s partnership with Oxford Investigation Services to strengthen its capacity to identify, prevent and investigate fraud through access to specialist expertise and investigative resources, was ongoing. Work in 2026/27 included reviews of potential second home premium avoidance, empty property discounts and Single Person Discounts, together with a fraud awareness campaign aimed at increasing awareness, encouraging reporting and supporting the earlier detection of fraud.

 

          Members welcomed the report and commended officers for the positive outcomes achieved through the Council's counter fraud work, noting the significant financial benefits and the prevention of fraud.

 

          The Committee sought clarification on whether any fraud cases had been referred to the police and whether any court action had resulted. Members were advised that there were no ongoing police investigations and that no cases had proceeded to court. It was further noted that, in some instances, individuals involved in tenancy fraud could be difficult to trace once they had left a property.

 

          In response to a question regarding the Council's partnership with Oxford Investigation Services, the Committee was advised that the arrangement continued to perform well and remained relatively new. The Council continued to explore additional ways to strengthen its counter fraud activities, including work relating to Single Person Discount reviews and close collaboration across service areas. It was emphasised that opportunities to improve fraud prevention and detection arrangements would continue to be pursued.

 

 

          The Committee noted the report.

 

 

302.

Work Programme pdf icon PDF 89 KB

The Committee is required to note the Work Programme for 2026/27.

[5 Minutes]

Minutes:

          The committee received and noted the Work Programme.